C3015 over 3RD BRANCH WHITE R.
0.2 MI JCT TH 15 + VT12A · County 017, Vermont · Built 1971 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.013139, -72.830189
This bridge is in worse condition than 17.2% of bridges in County 017. The average bridge in Vermont is 0 years old; this one is 55 years old.
Nearby Bridges
VT 00100 ML over ALDER MEADOW BROOK
Built 1933
C3002 over KENDALL BROOK
Built 2020
VT 00100 ML over ALDER MEADOW BROOK
Built 1933
VT 00100 ML over ALDER MEADOW BROOK
Built 1932
VT 00100 ML over ALDER MEADOW BROOK
Built 1933
C3002 over ALDER MEADOW BROOK
Built 1995
C3026 over WHITE RIVER
Built 1985
VT 00100 ML over ALDER MEADOW BROOK
Built 1936
C3004 over CLARK BROOK
Built 1950
VT 00100 ML over WHITE RIVER
Built 1936
Bridge Details
- Structure #
- 100902001309021
- Year Built
- 1971
- Reconstructed
- 2013
- Length
- 11.6 m (38.1 ft)
- Max Span
- 10.7 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $320,000
- Total Project Cost
- $470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.