C2003 over GIHON RIVER

0.01 MI TO JCT W VT100C · County 015, Vermont · Built 1959 · 1 Lanes · 1,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
100806000408061
Year Built
1959
Reconstructed
1996
Length
19.5 m (64 ft)
Max Span
16.5 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
1,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$340,000
Total Project Cost
$391,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.