C3011 over MILL RIVER

0.1 MI TO JCT W CL3 TH9 · County 011, Vermont · Built 1906 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100608003006081
Year Built
1906
Reconstructed
1990
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$231,000
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.