C3022 over BRUSH BROOK

0.7 MI TO JCT W CL3 TH21 · County 007, Vermont · Built 2023 · 1 Lanes · 15 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

44.296983, -72.932036

This bridge is in worse condition than 6.5% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
100408003204081
Year Built
2023
Length
12.5 m (41 ft)
Max Span
11.3 m
Width
6.1 m (20 ft)
Lanes
1
Daily Traffic
15
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$391,000
Total Project Cost
$541,000