C3015 over COLCHESTER POND BRK.

0.16 MI TO JCT W C3 TH17 · County 007, Vermont · Built 1960 · 1 Lanes · 75 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
100405001404051
Year Built
1960
Reconstructed
2011
Length
11.6 m (38.1 ft)
Max Span
10.4 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
75
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$186,000
Total Project Cost
$236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.