C2001 over PRESTON BROOK
0.01 MI TO JCT W C3 TH12 · County 007, Vermont · Built 1939 · 2 Lanes · 500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.373228, -72.905722
This bridge is in worse condition than 49.5% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 87 years old.
Nearby Bridges
I 00089 ML over I 89 OVER TH NO 4
Built 1964
C3015 over JOINER BROOK
Built 1919
I 00089 ML over I 89 OVER US2&JOINER BK
Built 1961
I 00089 ML over I 89 OVER US2&JOINER BK
Built 1961
US 00002 ML over JOINER BROOK
Built 1961
I 00089 ML over I 89 OVER TH NO 14
Built 1964
I 00089 ML over I 89 OVER TH NO 14
Built 1964
C2003 over WINOOSKI RIVER
Built 2002
C2003 over HUNTINGTON RIVER
Built 1937
I 00089 ML over I 89 OVER US 2
Built 1964
Bridge Details
- Structure #
- 100401000804011
- Year Built
- 1939
- Length
- 19.5 m (64 ft)
- Max Span
- 18.9 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $564,000
- Total Project Cost
- $615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.