C3001 over HELL HOLLOW BROOK

1.4 MI N JCT RT9 & TH1 · County 003, Vermont · Built 1934 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100217000202171
Year Built
1934
Reconstructed
1975
Length
15.5 m (50.9 ft)
Max Span
14.6 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$483,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.