C2004 over BATTEN KILL RIVER

0.3 MI TO JCT W US7 · County 003, Vermont · Built 1931 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
100203003402031
Year Built
1931
Length
10.1 m (33.1 ft)
Max Span
9.4 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$271,000
Total Project Cost
$321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.