C30PR over PARAN RIVER

0.06 MI TO JCT W CL1 TH2 · County 003, Vermont · Built 1900 · 2 Lanes · 750 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
100202007102021
Year Built
1900
Reconstructed
1960
Length
7.6 m (24.9 ft)
Max Span
6.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
750
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$315,000
Total Project Cost
$365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.