C3012 over LEMON FAIR RIVER

0.06 MI TO JCT W CL3 TH5 · County 001, Vermont · Built 1974 · 1 Lanes · 150 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 6 Satisfactory

Location

44.047272, -73.250881

This bridge is in worse condition than 51.7% of bridges in County 001. The average bridge in Vermont is 0 years old; this one is 52 years old.

Nearby Bridges

Bridge Details

Structure #
100122001101221
Year Built
1974
Length
25.9 m (85 ft)
Max Span
25 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
150
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$479,000
Total Project Cost
$529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.