C2005 over NEW HAVEN RIVER

0.2 MI TO JCT W CL1 TH1 · County 001, Vermont · Built 2014 · 2 Lanes · 570 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100103003101031
Year Built
2014
Length
37.5 m (123 ft)
Max Span
36.9 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
570
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.