C3027 over POTASH BROOK

0.5 MI TO JCT W CL3 TH28 · County 001, Vermont · Built 1919 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100102002401021
Year Built
1919
Reconstructed
2022
Length
10.4 m (34.1 ft)
Max Span
9.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$368,000
Total Project Cost
$518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.