SR-85 Frontage over SR-85 Frntg over Ramp B

SR-85 Frntg over Ramp B · County 049, Utah · Built 2024 · 2 Lanes · 14,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
4F 960
Year Built
2024
Length
36.2 m (118.8 ft)
Max Span
34.5 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
14,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.