SR-85 Frontage over SR-85 Frntg over Ramp B
SR-85 Frntg over Ramp B · County 049, Utah · Built 2024 · 2 Lanes · 14,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.4142, -111.929994
This bridge is in worse condition than 17.5% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 2 years old.
Nearby Bridges
SR-85 Frontage over SR-85 Mainline
Built 2024
SR-85 Frontage over SR-85 Frntg over Ramp C
Built 2024
SR-68 REDWOOD RD. over Ped Trail
Built 2019
SR-68 REDWOOD RD. over WILDLIFE CROSSING
Built 2010
SR-68 REDWOOD ROAD over CAMP WILLIAMS ROAD
Built 2010
CO.RD.-9600 NO.ST. over JORDAN RIVER
Built 1995
SR-194 EB over LOCAL ACCESS ROAD
Built 2011
SR-194 WB 2100 No. over LOCAL ACCESS ROAD
Built 2011
CLUB HOUSE DRIVE over UPRR TRACKS
Built 2006
SR-194 EB over JORDAN RIVER
Built 2011
Bridge Details
- Structure #
- 4F 960
- Year Built
- 2024
- Length
- 36.2 m (118.8 ft)
- Max Span
- 34.5 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 14,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.