I-80 WBL (SR-80) over CO.RD. INT.X-ROAD

Echo Jct. Interchange · County 043, Utah · Built 2009 · 2 Lanes · 12,405 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4F 792
Year Built
2009
Length
25.1 m (82.3 ft)
Max Span
24.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,405
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.