I-70 (SR-70) WBL over COTTONWOOD CANYON WASH

S.OF N.RICHFIELD INTCH. · County 041, Utah · Built 1988 · 3 Lanes · 7,301 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4F 537
Year Built
1988
Length
40.4 m (132.5 ft)
Max Span
39.6 m
Width
18.7 m (61.4 ft)
Lanes
3
Daily Traffic
7,301
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.