I-70 (SR-70) WBL over CO.RD. CUNNINGHAM RANCH
1.2 MI.E.of W.CISCO INT. · County 019, Utah · Built 1971 · 2 Lanes · 9,164 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.95505, -109.387544
This bridge is in worse condition than 42.1% of bridges in County 019. The average bridge in Utah is 0 years old; this one is 55 years old.
Nearby Bridges
I-70 (SR-70) EBL over CO.RD. CUNNINGHAM RANCH
Built 1971
I-70 (SR-70) EBL over UNION PACIFIC RAILROAD
Built 1971
I-70 (SR-70) WBL over UNION PACIFIC RAILROAD
Built 1971
I-70 (SR-70) WBL over NASH WASH
Built 1971
I-70 (SR-70) EBL over NASH WASH
Built 1971
SR-128 over NASH WASH
Built 1949
SR-128 INT.X-ROAD. over I-70 (SR-70)
Built 1968
I-70 (SR-70) EBL over CISCO WASH
Built 1971
I-70 (SR-70) WBL over CISCO WASH
Built 1971
I-70 (SR-70) WBL over UNNAMED WASH
Built 1974
Bridge Details
- Structure #
- 4F 271
- Year Built
- 1971
- Length
- 33.7 m (110.6 ft)
- Max Span
- 32 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 9,164
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.