I-70 (SR-70) WBL over COUNTY ROAD (INT.X-ROAD)

SPRING CANYON INTERCHANGE · County 041, Utah · Built 1973 · 2 Lanes · 6,239 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4F 222
Year Built
1973
Length
28.4 m (93.2 ft)
Max Span
26.8 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
6,239
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.