I-84 (SR-84) WBL over STODDARD FARM ROAD
3.9 MI.E.PETERSON INTER. · County 029, Utah · Built 1964 · 2 Lanes · 11,655 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.066469, -111.711342
This bridge is in worse condition than 60% of bridges in County 029. The average bridge in Utah is 0 years old; this one is 62 years old.
Nearby Bridges
I-84 (SR-84) EBL over STODDARD FARM ROAD
Built 1964
COUNTY ROAD over I-84 (SR-84) and UPRR
Built 1964
Stoddard Ln Cty Rd over Weber River
Built 2019
I-84 (SR-84) WBL over MORGAN FARM ROAD
Built 1962
I-84 (SR-84) EBL over MORGAN FARM ROAD
Built 1962
COUNTY ROAD over DEEP CREEK
Built 1960
I-84 (SR-84) EBL over SR-66 INTCHG. X-ROAD
Built 1962
I-84 (SR-84) EBL over SR-66 INTCHG. X-ROAD
Built 1962
I-84 (SR-84) WBL over SR-66 INTCHG. X-ROAD
Built 1962
SR-66 over WEBER RIVER
Built 2010
Bridge Details
- Structure #
- 4D 677
- Year Built
- 1964
- Length
- 24.4 m (80.1 ft)
- Max Span
- 9.1 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 11,655
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.