I-215 (SR-215) WBL over SR-68 REDWOOD ROAD
Redwd.Rd.Intchg.-60th So. · County 035, Utah · Built 1976 · 5 Lanes · 102,805 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.644506, -111.93875
This bridge is in worse condition than 95.9% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 50 years old.
Nearby Bridges
I-215 (SR-215) EBL over SR-68 REDWOOD ROAD
Built 1976
I-215 (SR-215) EBL over 14TH W. & NO.JORDAN
Built 1977
I-215 (SR-215) WBL over 14TH W. & NO.JORDAN
Built 1977
5960 SOUTH over NORTH JORDAN CANAL
Built 1999
BULLION STREET over NORTH JORDAN CANAL
Built 1986
6200 SOUTH STREET over UTAH AND SALT LAKE CAN
Built 1994
2200 WEST STREET over UT AND SL CANAL
Built 1981
SR-173 5400 SO.ST. over NORTH JORDAN CANAL
Built 1974
BULLION STREET over JORDAN RIVER
Built 1986
2200 WEST STREET over UTAH AND SALT LAKE CAN
Built 1975
Bridge Details
- Structure #
- 4C 585
- Year Built
- 1976
- Reconstructed
- 2004
- Length
- 61.6 m (202.1 ft)
- Max Span
- 41.5 m
- Width
- 32.5 m (106.6 ft)
- Lanes
- 5
- Daily Traffic
- 102,805
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.