I-15SB (SR-15) over 100 E. in AMERICAN FORK

SE part of American Fork · County 049, Utah · Built 2011 · 6 Lanes · 209,636 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3F 812
Year Built
2011
Length
38.1 m (125 ft)
Max Span
36.5 m
Width
30.7 m (100.7 ft)
Lanes
6
Daily Traffic
209,636
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.