I-15 (SR-15) SBL over 8000 SOUTH ST.(WASATCH)

400 W.8000 SO.IN MIDVALE · County 035, Utah · Built 1998 · 7 Lanes · 230,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
3F 647S
Year Built
1998
Reconstructed
2009
Length
38.5 m (126.3 ft)
Max Span
21.3 m
Width
33.2 m (108.9 ft)
Lanes
7
Daily Traffic
230,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.