I-15 (SR-15) SBL over SR-115 PAYSON MAIN ST.

PAYSON INTERCHANGE · County 049, Utah · Built 1967 · 3 Lanes · 37,030 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
3F 127
Year Built
1967
Reconstructed
2013
Length
47.7 m (156.5 ft)
Max Span
21.6 m
Width
18.4 m (60.4 ft)
Lanes
3
Daily Traffic
37,030
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.