I-15 (SR-15) SBL over SR-267 400 SOUTH ST.

700 WEST 400 SOUTH ST. · County 035, Utah · Built 2000 · 4 Lanes · 172,645 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3C 875S
Year Built
2000
Length
154.9 m (508.2 ft)
Max Span
70.8 m
Width
22.4 m (73.5 ft)
Lanes
4
Daily Traffic
172,645
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.