SR-67SB RP.fr.I-15 over UPRR & UTA TRACKS

No.Farmington Interchange · County 011, Utah · Built 2008 · 3 Lanes · 4,423 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
3C 864
Year Built
2008
Length
191.3 m (627.6 ft)
Max Span
78 m
Width
21.1 m (69.2 ft)
Lanes
3
Daily Traffic
4,423
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.