I-15 (SR-15) SBL over MALAD RIVER
1.5 MI.SO.PLYMOUTH INT. · County 003, Utah · Built 1990 · 2 Lanes · 13,856 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.86515, -112.169794
This bridge is in worse condition than 35.9% of bridges in County 003. The average bridge in Utah is 0 years old; this one is 36 years old.
Nearby Bridges
I-15(SR-15)NBL over MALAD RIVER
Built 1990
6000 WEST ST.CO.RD over MALAD RIVER
Built 2013
I-15 (SR-15) SBL over UNION PACIFIC RAILROAD
Built 1990
I-15(SR-15)NBL over UNION PACIFIC RAILROAD
Built 1990
19200 NO. CO.RD. over MALAD RIVER
Built 1962
I-15 (SR-15) NBL over CO. RD. TO NUCOR & SR-13
Built 1989
I-15 (SR-15) SBL over CO. RD. TO NUCOR & SR-13
Built 1989
COUNTY ROAD over I-15 (SR-15)
Built 1989
CO. RD. 20800 NO. over MALAD RIVER
Built 1980
SR-13 over BOTHWELL CANAL
Built 1939
Bridge Details
- Structure #
- 3C 764
- Year Built
- 1990
- Length
- 151.4 m (496.7 ft)
- Max Span
- 61 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 13,856
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.