SR-227 SB.WALKER L over I-15 (SR-15) NBL & S

0.5 Mi. N. of Glover Lane · County 011, Utah · Built 1973 · 1 Lanes · 6,991 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
3C 521
Year Built
1973
Length
118 m (387.1 ft)
Max Span
39.6 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
6,991
Material
Steel Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.