I-15 (SR-15) SBL over SR-13 AND UPRR

NORTH BRIGHAM INTERCHANGE · County 003, Utah · Built 1967 · 3 Lanes · 32,262 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
3C 334
Year Built
1967
Reconstructed
2021
Length
73.1 m (239.8 ft)
Max Span
47.5 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
32,262
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.