I-80 EBL OFF-RAMP over MAIN STREET

2410 SO. MAIN in SO.SL. · County 035, Utah · Built 2000 · 2 Lanes · 127,090 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2F 627
Year Built
2000
Length
45.4 m (149 ft)
Max Span
25.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
127,090
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.