SR-70 (I-70) EBL over COUNTY ROAD INTCHG.X-RD

AT CLEAR CREEK INTCHG. · County 041, Utah · Built 1980 · 2 Lanes · 5,849 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
2F 402
Year Built
1980
Length
31.7 m (104 ft)
Max Span
30.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
5,849
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.