I-84 (SR-84) EBL over CO.RD. INTCHG. X-ROAD
PETERSON INTERCHANGE · County 029, Utah · Built 1964 · 2 Lanes · 11,990 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.115464, -111.763781
This bridge is in worse condition than 60% of bridges in County 029. The average bridge in Utah is 0 years old; this one is 62 years old.
Nearby Bridges
I-84 (SR-84) WBL over CO.RD. INTCHG. X-ROAD
Built 1964
COUNTY ROAD over UNION PACIFIC RR
Built 1961
COUNTY ROAD over WEBER RIVER
Built 1961
COUNTY ROAD over PETERSON CREEK
Built 1955
COUNTY ROAD over WEBER BASIN CANAL
Built 1960
I-84 (SR-84) EBL over PETERSON FARM ROAD
Built 1964
I-84 (SR-84) WBL over PETERSON FARM ROAD
Built 1964
COUNTY ROAD over COTTONWOOD CREEK
Built 1930
I-84 (SR-84) EBL over COTTONWOOD CREEK
Built 1966
I-84 (SR-84) WBL over COTTONWOOD CREEK
Built 1966
Bridge Details
- Structure #
- 2F 30
- Year Built
- 1964
- Reconstructed
- 2012
- Length
- 38.5 m (126.3 ft)
- Max Span
- 12.6 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 11,990
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.