I-215 (SR-215) EBL over JORDAN RIVER

1100 WEST 6200 SO. SL CO. · County 035, Utah · Built 1971 · 4 Lanes · 102,805 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2F 133
Year Built
1971
Reconstructed
2003
Length
39.6 m (129.9 ft)
Max Span
18.9 m
Width
24.1 m (79.1 ft)
Lanes
4
Daily Traffic
102,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.