I-70 (SR-70) EBL over I-15 (SR-15) NBL AND SBL

COVE FORT INTERCHANGE · County 027, Utah · Built 1966 · 2 Lanes · 4,915 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
2C 467
Year Built
1966
Reconstructed
2023
Length
72.5 m (237.9 ft)
Max Span
24.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
4,915
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.