SR-85 (MVC) NB over SR-201

SR-85 (MVC) over SR-201 · County 035, Utah · Built 2021 · 3 Lanes · 11,420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1F 916
Year Built
2021
Length
66.8 m (219.2 ft)
Max Span
39.4 m
Width
24 m (78.7 ft)
Lanes
3
Daily Traffic
11,420
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.