I-15NB (SR-15) over 400 SOUTH ST. in OREM
800 West 400 South · County 049, Utah · Built 2012 · 14 Lanes · 182,420 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
40.289692, -111.725433
This bridge is in worse condition than 19.3% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 14 years old.
Nearby Bridges
I-15SB (SR-15) over 400 SOUTH ST.in OREM
Built 2012
SR-114 GENEVA ROAD over UPRR & UTA TRACKS
Built 2012
I-15 (SR-15) NBL over Center Street in Orem
Built 2011
I-15 (SR-15) SBL over Center Street in Orem
Built 2011
I-15 (SR-15) NBL over 400 North Street
Built 2011
SR-265 over UPRR and UTA
Built 2001
I-15 (SR-15) SBL over 400 North Street
Built 2011
SR-265 INT.X-RD. over I-15 (SR-15) NBL AND SBL
Built 2001
I-15 (SR-15) NB over SR-52 INTCHG. X-ROAD
Built 2011
I-15SB (SR-15) over SR-52 INTCHG. X-ROAD.
Built 2011
Bridge Details
- Structure #
- 1F 815
- Year Built
- 2012
- Length
- 32.3 m (106 ft)
- Max Span
- 31.4 m
- Width
- 34.2 m (112.2 ft)
- Lanes
- 14
- Daily Traffic
- 182,420
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.