I-15 NB (SR-15) over SR-175 11400 SO. ST.
At the 114th South Intchg · County 035, Utah · Built 2010 · 5 Lanes · 159,640 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.543947, -111.894375
This bridge is in worse condition than 19.5% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 16 years old.
Nearby Bridges
I-15 SB (SR-15) over SR-175 11400 SOUTH ST.
Built 2010
SR-175 (11400 S.) over JORDAN & SALT LAKE C
Built 2010
LONE PEAK PARKWAY over JORDAN AND SALT LAKE C
Built 2004
11400 SOUTH STREET over EAST JORDAN CANAL
Built 1987
SR-175 (11400 S.) over UPRR & UTA TRACKS
Built 2011
11000 SOUTH STREET over JORDAN AND SALT LAKE C
Built 1995
SR-175 (11400 SO.) over WILLOW CREEK
Built 2010
US-89 (SR-89) over JORDAN & SALT LAKE CANAL
Built 1956
11000 SOUTH STREET over EAST JORDAN CANAL
Built 1996
300 EAST STREET over EAST JORDAN CANAL
Built 1998
Bridge Details
- Structure #
- 1F 784
- Year Built
- 2010
- Length
- 65.5 m (214.9 ft)
- Max Span
- 64.6 m
- Width
- 27.6 m (90.6 ft)
- Lanes
- 5
- Daily Traffic
- 159,640
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.