I-15 (SR-15) NBL over SR-97 5600 SO. ROY

Roy Interchange (5600 S.) · County 057, Utah · Built 1966 · 4 Lanes · 107,360 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1F 66
Year Built
1966
Length
55.9 m (183.4 ft)
Max Span
26.2 m
Width
20.8 m (68.2 ft)
Lanes
4
Daily Traffic
107,360
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.