I-15 (SR-15) NBL over SR-270 SBL

APPROX.450 W.1200 SO.SLC. · County 035, Utah · Built 1999 · 7 Lanes · 217,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1F 636N
Year Built
1999
Length
64.6 m (211.9 ft)
Max Span
26.2 m
Width
33 m (108.3 ft)
Lanes
7
Daily Traffic
217,800
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.