I-15 (SR-15) NBL over SR-193 700 S. CLEARFIELD

CLEARFIELD INT. (700 SO) · County 011, Utah · Built 1966 · 4 Lanes · 137,245 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1F 63
Year Built
1966
Reconstructed
2021
Length
62 m (203.4 ft)
Max Span
17.7 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
137,245
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.