I-15 (SR-15) NBL over I-215 WB RAMP to I-15 SB

6400 SOUTH INTERCHANGE · County 035, Utah · Built 2000 · 6 Lanes · 191,939 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1F 615N
Year Built
2000
Length
66.4 m (217.8 ft)
Max Span
63.4 m
Width
29.5 m (96.8 ft)
Lanes
6
Daily Traffic
191,939
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.