I-15 (SR-15) NBL over NERVA LANE (COUNTY ROAD)

1.9 MI.NO.HOT SPRINGS INT · County 003, Utah · Built 1976 · 3 Lanes · 67,875 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1F 169
Year Built
1976
Reconstructed
2016
Length
25.8 m (84.6 ft)
Max Span
25 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
67,875
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.