I-15 (SR-15) NBL over LELAND SUGAR FACTORY RD.

1.7 MI.SW.SPANISH FK.INT. · County 049, Utah · Built 1967 · 3 Lanes · 48,010 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1F 103
Year Built
1967
Reconstructed
2008
Length
42.1 m (138.1 ft)
Max Span
18.1 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
48,010
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.