SR-212 TELGRPH ST. over MILL CREEK
In Washington City · County 053, Utah · Built 2012 · 5 Lanes · 19,451 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.130003, -113.515458
This bridge is in worse condition than 27.1% of bridges in County 053. The average bridge in Utah is 0 years old; this one is 14 years old.
Nearby Bridges
200 SOUTH STREET over MILL CREEK
Built 2002
I-15 (SR-15) NB&SB over MILL CREEK
Built 1964
BUENA VISTA BLVD. over MILL CREEK
Built 1999
I-15 (SR-15) SBL over SR-212 SPUI INT.X-ROAD.
Built 2003
I-15 (SR-15) NBL over SR-212 SPUI.INT.X-Road.
Built 2003
I-15 over Washington Main Street
Built 2023
I-15 SBL over Washington Main Street
Built 2023
INDUSTRIAL ROAD over MILL CREEK
Built 2008
CITY STREET over VIRGIN RIVER
Built 1976
I-15 over Mall Drive
Built 2017
Bridge Details
- Structure #
- 0V2111
- Year Built
- 2012
- Length
- 8.1 m (26.6 ft)
- Max Span
- 8.1 m
- Width
- 39.6 m (129.9 ft)
- Lanes
- 5
- Daily Traffic
- 19,451
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.