SR-150 over UPPER PROVO RIVER
23.1 Miles East of Kamas · County 043, Utah · Built 2005 · 2 Lanes · 620 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
40.648042, -110.946108
This bridge is in worse condition than 24.1% of bridges in County 043. The average bridge in Utah is 0 years old; this one is 21 years old.
Bridge Details
- Structure #
- 0F 724
- Year Built
- 2005
- Length
- 18.3 m (60 ft)
- Max Span
- 15.2 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 620
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.