US-89 (SR-89) over LOGAN RIVER

13 MILES UP LOGAN CANYON · County 005, Utah · Built 1998 · 2 Lanes · 8,608 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0F 605
Year Built
1998
Length
80.8 m (265.1 ft)
Max Span
40 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
8,608
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.