SR-152 20TH E.ST. over I-215 EBL & On-Ramp
2000 EAST 6450 SO.SLC.CO. · County 035, Utah · Built 1985 · 6 Lanes · 52,010 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.632969, -111.834089
This bridge is in worse condition than 79.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 41 years old.
Nearby Bridges
ON RAMP TO I-215WB over SR-152 & I-215 (SR-215)
Built 1987
2300 EAST STREET over I-215 (SR-215) EBL &
Built 1988
7000 SOUTH STREET over EAST JORDAN CANAL
Built 1970
1300 EAST STREET over I-215 (SR-215) EBL &
Built 1984
6200 SOUTH STREET over BIG COTTONWOOD CREEK
Built 1935
HOLLADAY BOULEVARD over BIG COTTONWOOD CREEK
Built 1989
I-215 WB.ON-RAMP over HLDY.BLVD.& BIG CTWD
Built 1989
I-215 (SR-215) over HLDY.BLVD.& BIG CTNW
Built 1989
I-215 EB OFF-RAMP over HLDY.BLVD.& BIG CTNW
Built 1989
WALKER LANE over JORDAN SALT LAKE CANAL
Built 1938
Bridge Details
- Structure #
- 0F 506
- Year Built
- 1985
- Length
- 73.3 m (240.5 ft)
- Max Span
- 37.2 m
- Width
- 31.1 m (102 ft)
- Lanes
- 6
- Daily Traffic
- 52,010
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.