SR-95 over FRY CANYON
57 MI WEST OF BLANDING · County 037, Utah · Built 1975 · 2 Lanes · 199 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.636006, -110.150064
This bridge is in worse condition than 49% of bridges in County 037. The average bridge in Utah is 0 years old; this one is 51 years old.
Bridge Details
- Structure #
- 0F 376
- Year Built
- 1975
- Length
- 22.2 m (72.8 ft)
- Max Span
- 21.3 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 199
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.