SR-266 4500 SO.ST. over JORDAN RIVER

WEST OF I-15 INTERCHANGE · County 035, Utah · Built 1966 · 4 Lanes · 37,650 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
0F 115
Year Built
1966
Length
35.3 m (115.8 ft)
Max Span
17.1 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
37,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.