I-70 (SR-70) over STATE CANAL
4.5 MI.NO.ELSINORE INTCHG · County 041, Utah · Built 1986 · 4 Lanes · 6,705 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.720842, -112.132206
This bridge is in worse condition than 40.1% of bridges in County 041. The average bridge in Utah is 0 years old; this one is 40 years old.
Nearby Bridges
I-70 over FLAT CANYON DRAINAGE CH.
Built 1986
I-70 (SR-70) over LOCAL ACCESS ROAD
Built 1986
SR-118 over RICHFIELD CANAL
Built 1956
COUNTY ROAD over SEVIER VALLEY CANAL
Built 1993
I-70 (SR-70) over STATE CANAL
Built 1985
I-70 (SR-70) WBL over SR-120 INTCHG.X-ROAD
Built 1988
I-70 (SR-70) EBL over SR-120 INTCHG.X-ROAD
Built 1988
COUNTY ROAD over SEVIER RIVER
Built 2006
COUNTY ROAD over SEVIER RIVER
Built 1991
I-70 (SR-70) EBL over SR-258 INTCHG. X-ROAD
Built 1988
Bridge Details
- Structure #
- 0E2306
- Year Built
- 1986
- Length
- 8.4 m (27.6 ft)
- Max Span
- 4.1 m
- Lanes
- 4
- Daily Traffic
- 6,705
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.