I-15 (SR-15)NB&SB over COUNTY ROAD
3.5 MILES NORTH of SCIPIO · County 027, Utah · Built 1987 · 4 Lanes · 13,296 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.303786, -112.087761
This bridge is in worse condition than 29.2% of bridges in County 027. The average bridge in Utah is 0 years old; this one is 39 years old.
Nearby Bridges
I-15 NB over Deer Crossing|County Roa
Built 1983
I-15 SB over DEER CROSSING | County R
Built 1983
US-50 (SR-50) over I-15 (SR-15) NBL & SBL
Built 1985
I-15 (SR-15)NB&SB over SCIPIO VALLEY DRAINAGE
Built 1978
JUAB COUNTY ROAD over YUBA LAKE SPILLWAY
Built 2012
I-15 (SR-15) NBL over DEER CROSSING
Built 1978
I-15 (SR-15) SBL over DEER CROSSING
Built 1978
I-15 (SR-15) NBL over SEVIER RIVER
Built 1982
I-15 (SR-15) SBL over SEVIER RIVER
Built 1982
COUNTY FRONTAGE RD over SEVIER RIVER
Built 1950
Bridge Details
- Structure #
- 0E2204
- Year Built
- 1987
- Length
- 8.7 m (28.5 ft)
- Max Span
- 7.9 m
- Lanes
- 4
- Daily Traffic
- 13,296
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.