SR-201 2100 S.ST. over BRIGHTON-NO.POINT CANAL

2800 WEST 2100 SOUTH SLC · County 035, Utah · Built 1972 · 14 Lanes · 114,360 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
0E1908
Year Built
1972
Length
6.4 m (21 ft)
Max Span
3.7 m
Lanes
14
Daily Traffic
114,360
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.